Design Stage
We will walk you through the planning and designing of your dream home. Your final plans will be drawn by a Florida Residential Design
Architect. With all of the appropriate information needed, so your plans can
be issued to the building department in which you will be building. We will process all necessary applications needed for a building permit
to be issued. If needed, we will
also recommend and assist you in obtaining a construction loan.
Slab Stage
In this stage we will prepare your lot to begin construction.
If needed we will have unwanted brush, trees, and debris removed and
hauled away and clean fill will be brought in to bring your lot up to health
department elevation standards. Once
the lot is ready we will begin to form the slab, underground utilities will be
installed, temporary electric will be brought in, a construction dumpster and
port-o-let will be brought to the site. Once
all of the underground utilities, reinforcing steel and form board have been
inspected and approved by the appropriate authorities we can begin pouring
concrete.
Dry In Stage
After concrete has been poured the slab is ready for exterior walls. All exterior walls will be constructed of CBS (Concrete Block System).
Once all block are in place we will begin forming a tie beam that will
cover the entire perimeter of all block walls. “Don’t be fooled by a U-Block or Lintel Beam” They are not the
same. After
all forms for the tie beam have been inspected and approved, the tie beam will
be poured with concrete. Then the
engineered pre manufactured roof trusses will be put into place, the roof will
be sheeted with plywood and will be dried in by the roofing contractor.
Rough In Stage
Once the roof is dried in the interior framers will begin laying out
and constructing all interior walls. After
all interior walls are set and in place all rough plumbing, will be put into
place. All electrical wiring will
be run throughout the house, including all central vacuum systems, intercom
systems and alarm systems if needed. All
air conditioning ductwork will be installed. Windows and exterior doorframes will be installed.
Insulation will be installed and inspected just prior to drywall.
Drywall Stage
After all interior rough work is completed, inspected and approved,
drywall will begin. All drywall
will be hung, taped and ready to paint. All
wet areas will be installed with appropriate material. Exterior walls will be lathed and stuccoed and ready to paint.
Roof will be completed with your choice of roofing material.
Interior Stage
All interior walls, woodwork and trim will be completed and painted
with your choice of paint colors. Your
selection of Kitchen Cabinets and counter tops and bathroom vanities and
vanity tops will be installed. The
floor covering of your choice will be installed in entire house (except for
carpet – that will be in the final stage). All driveway, patio and walkways will be completed.
Final Stage
All electrical, air conditioning and plumbing trim will be completed.
Carpet will be installed. Sod
will be laid. Entire house will
be cleaned and ready to move into All improvements will be fully completed and
in compliance with Construction Contract.
Superior
Home Builders, Inc.
11547 54th Street North
Royal Palm Beach, FL 33411
Office#- 561-793-8656
FAX#- 561-793-9184
info@superiorhomebuilders.com
|